Hanging Siding First Row

After the first row of cedar shake shingles has been firmly placed on the wall the design choice can be made.
Hanging siding first row. Vinyl siding starter strips snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house. Attach the starter strip to the plywood but don t nail it so tightly that it will restrict the strip s movement. Apply sealant to the ends fit them together and drive one nail through the overlapping board inch to the side of the joint. It is important to check your level every four or five courses by putting a level on the siding.
On hot days because the siding will contract when the temperature drops. This is where the new siding will begin. Snap a level line all the way around your house and make sure it s level. To keep the cedar shakes even align the bottoms of each shingle flush.
Expert advice on how to install wood or fiber cement lap siding including how to prepare exterior walls and lay out siding for installation. On the sides of the house start each row at the back corner so you don t see the seams from the street. Lap siding also called horizontal siding or clapboard may be made of wood fiber cement plywood hardboard or similar materials. If the seams overlap away from the line of sight they become nearly invisible.
The purpose of the starter strip is to give the first row of siding the proper pitch as the rest of the siding. From the top of this row and stretch a string line across the deck. Shingles can be made to run in even rows or produce a staggered effect. The first piece of vinyl you re going to hang is on the starter strip.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows. It will be made of aluminum and it usually comes about 3 inches in width and 12 feet long. Lap them the other way and they ll be a real eyesore. To provide a common reference point measure up 8 in.
To do that you usually will position a 1 1 2 wide strip that is about 1 4 wide at the very bottom edge of the sheathing or just a little below. An inch above the siding s butt edge drive in one 7d nail into each stud.